Abstract:The current filed and sediment movement around the Dayangshan island before and after a reclamation project is simulated using the three-dimensional ocean numerical model FVCOM, and the variation of tidal current and sediment distribution is discussed. Results show that after the reclamation, the maximum of flooding current and ebb current weakens and sediment concentration decreases within 0.26 km offshore west and southeast of the project area, while no obvious change of tidal currents and sediment distribution occurs further; Southeast of the project may have weak sedimentation accumulation, and sediment erosion may occur west of the project.
DOU Ming,ZUO Jun-cheng,CHEN Mei-xiang et al. The influence of Dayangshan reclamation project on the environment of adjacent sea area[J]. Marine Environmental Science, 2018, 37(3): 409-417,447.
JIAO R,ZHOU B.Research and application of Mike21 model in marine environmental impact assessment from fifth stage project of Beilun harbor[C]//International Conference on Remote Sensing,Environment and Transportation Engineering.IEEE,2011:4299-4301.
[5]
HUANG H S,CHEN C S,COWLES G W,et al.FVCOM validation experiments:comparisons with ROMS for three idealized barotropic test problems[J].Journal of Geophysical Research:Oceans,2008,113(C7):C07042.
HUANG H,DU Y,POTHINA D,et al.Corpus Christi Bay Three-Dimensional Hydrodynamics and Salinity Simulations Using Finite-Volume Coastal Ocean Model (FVCOM)[C]//International Conference on Estuarine and Coastal Modeling.2012:46-65.
WANG Y,YE W,LI M C.Research of sediment transport trend and erosion-deposition characteristic of Yangma island sea area[J].Applied Mechanics and Materials,2014,580/583:2189-2193.